Selected References

Engineering references with measurable technical scope.

Selected assignments are presented with client, period, capacity and services to show the scale and depth of ÇEVPRO's multidisciplinary engineering experience.

ÇEVPRO project image Wastewater • MBBR / IFAS

Menemen & Foça Bağarası WWTP Capacity Upgrades

Feasibility and multidisciplinary implementation design for capacity upgrades of two existing wastewater treatment plants.

ClientİZSU
Period2023–2024
Menemen21,600 → 60,000 m³/day
Bağarası2,100 → 3,300 m³/day
ScopeMBBR and IFAS process upgrades without changes to existing structures; process, architectural, structural, mechanical and electrical design; tender documents and BoQ.
View project profile →
Çiğli WWTP sludge storage area — ÇEVPRO project image Sludge • Rehabilitation

Çiğli WWTP Sludge Storage Area Rehabilitation

Detailed rehabilitation and closure design for a major sludge storage area at Çiğli WWTP.

ClientİZSU
Period2024
Site131 ha
Stored sludge≈ 2.5 million m³
ScopeDeep lime mixing rehabilitation, closure implementation design, tender documents, data sheets and bills of quantities.
View project profile →
Torbalı Wastewater Treatment Plant — ÇEVPRO project image Wastewater • Detailed Design • EIA

Torbalı Wastewater Treatment Plant — 2nd Stage

Implementation design and environmental impact assessment for a large municipal wastewater treatment plant.

ClientİZSU
Period2016–2018
Capacity56,000 m³/day
ProcessNitrification-denitrification
ScopeMultidisciplinary detailed design, tender documents and Environmental Impact Assessment Study.
View project profile →
İvrindi, Manyas and Erdek wastewater treatment plant detailed design — ÇEVPRO project image Wastewater • Detailed Design

İvrindi, Manyas & Erdek WWTP Detailed Designs

Feasibility and detailed implementation design of three wastewater treatment plants in Balıkesir Province.

ClientBASKİ
Period2023–2024
İvrindi / Manyas2,500 m³/day each
Erdek4,500 m³/day
ScopeFeasibility, implementation design, detailed projects, tender documents, data sheets and bills of quantities.
Odour treatment systems for four wastewater pumping stations in İzmir Odour Control • Detailed Design

Odour Treatment for 4 Pumping Stations in İzmir

Detailed design of odour treatment systems for Karşıyaka, Bayraklı, Çiğli and Gümrük wastewater pumping stations.

ClientİZSU
Period2017–2018
Facilities4 pumping stations
DisciplineMultidisciplinary FD
ScopeProcess, architectural, civil, mechanical, electrical and automation design for odour treatment systems, plus tender documents.
Cyprus industrial and septage wastewater treatment facility — ÇEVPRO project image UNDP • Cyprus • Detailed Design

Industrial & Septage Wastewater Treatment Facility

Multidisciplinary detailed design for an industrial and septage wastewater treatment facility.

Client / ProgrammeUNDP
CountryCyprus
Period2021–2022
ServicesMultidisciplinary FD
ScopeProcess, architectural, civil, mechanical, electrical and automation design, EIA, BoQ and implementation advisory services.
View project profile →
Bostanlı Dam water treatment plant — ÇEVPRO project image Water • Detailed Design

Bostanlı Dam Water Treatment Plant & Transmission Line

Multidisciplinary detailed design of a water treatment plant and associated transmission infrastructure.

ClientİZSU
Period2016–2018
WTP Capacity150 L/s
Transmission7 km
ScopeProcess, architectural, civil, mechanical, electrical and automation design; transmission line design; tender documents.
View project profile →
Four water treatment plants for Mordoğan, Karaçam, Çandarlı and Bozköy dams — ÇEVPRO project image Water • 4 Plants • Detailed Design

4 Water Treatment Plants for Mordoğan, Karaçam, Çandarlı & Bozköy Dams

Detailed design of four water treatment plants serving different dam-water supplies in İzmir Province.

ClientİZSU
Period2015–2016
Capacities12 / 16 / 45 / 63 L/s
Plants4 WTPs
ScopeProcess, architectural, civil, mechanical, electrical and automation detailed design and preparation of tender documents.
Mordoğan Wastewater Treatment Plant — ÇEVPRO project image Wastewater • Detailed Design

Mordoğan Wastewater Treatment Plant

Detailed design of a municipal wastewater treatment plant based on activated sludge with nitrification-denitrification.

ClientİZSU
Period2015–2016
Average Flow11,000 m³/day
Maximum Flow16,500 m³/day
ScopeProcess, architectural, civil, mechanical, electrical and automation detailed design; tender documents.
Halkapınar water treatment works — ÇEVPRO project image Water • Detailed Design

Halkapınar Water Treatment Plant

Multidisciplinary detailed design of a high-capacity water treatment plant for raw water with high arsenic content.

ClientİZSU
Period2014
Capacity500 L/s
Raw WaterHigh arsenic content
ScopeProcess, architectural, civil, mechanical, electrical and automation detailed design and tender documents.
ÇEVPRO project image Water • Detailed Design

Menemen Water Treatment Plant

Detailed design of a water treatment plant for raw water with high arsenic content.

ClientİZSU
Period2015
Capacity250 L/s
ServicesFD • Tender Docs
ScopeProcess, architectural, civil, mechanical, electrical and automation detailed design and tender documentation.
Masallı water and wastewater treatment facilities — ÇEVPRO project image World Bank • Azerbaijan • Detailed Design

Masallı Water & Wastewater Treatment Plants

Process and detailed engineering for municipal water and wastewater treatment facilities.

CountryAzerbaijan
FinancingWorld Bank
WWTP7,500 m³/day • 31,200 PE
WTP22,200 m³/day
ScopeDetailed design of municipal wastewater and water treatment plants.
View project profile →
Turkmenistan • Detailed Design

Kaka Water Treatment Plant

Detailed design of a compact water treatment plant with conventional treatment and UV disinfection.

CountryTurkmenistan
Period2012
Capacity3,000 m³/day
ServicesFinal Design
ProcessCoagulation, flocculation, sedimentation, pressurised sand filtration, UV disinfection and storage tanks.